Research and Development

Auditing and research are the basis of industrial development
Conducting a technological audits and technological studies of industrial technology operations is a key process in determining the optimal operation of production operations and what are the shortcomings. Technology audit will open up opportunities to integrate future production technology with the latest technologies to increase efficiency, run production without losses, and extend the life of the plant.
Areas focusing on research
We conduct feasibility studies and design based on our research in order to cover a wide range of production in our audits and research, and to implement our future projects at a high level of quality.
Reference projects
Major practical research portfolios

Power plant | Darkhan city | Mongolia
Research on 220/110kV substation automation system
- Transfer of 110kV and 220kV substations to a fully automated system
- Make a conclusion on the accident-free operation of Zuun kharaa and Shariin gol substations

Erdenet GOK | Erdenet city | Mongolia
Research in concentrator technology
- Conducted a technology audit of the concentrator's operations
- Technological audit of industrial water supply operations was conducted and conclusions were made
- Based on the audit, a proposal was made to introduce a MES system at the concentrator

USUG | Ulaanbaatar city | Mongolia
Research in retransmission station at USUG
- Research work to evaluate the equipment operation of USUG Central Pumping Station, Industrial Pumping Station, Meat Pumping Station and CHP2 Water Transmission Station in Ulaanbaatar
- By conclusion, transfer to a fully automatic system to update the mode settings of pump stations

National Power Transmission Network (NPTN) | Ulaanbaatar city | Mongolia
Research and conclusion on the operation of power transmission (PT) station
- Research to evaluate the reliability of equipment of PT stations in Ulaanbaatar and Darkhan, Erdenet, Shariin gol, Zuun kharaa, Baruun kharaa PT stations.
- The conclusion of the study is to ensure reliable operation of automation of relay protection control of stations

Mongolian Railway | Ulaanbaatar city | Mongolia
Baganuur-Tolgoit 210 km road electrification project
- Research work to electrify 210 km of Baganuur-Tolgoit coal transportation railway
- Based on the research, implement an automated system for construction, management and control of power transmission substations to run electric heads on 210 km of road
Questionnaire
Prepare for tomorrow, benefit today
When we receive a request in the form of a completed enclosed questionnaire, our experts will contact you and offer a solution that best meets your expectations and conditions. We are more than ready to help!